Skip to main content

Research Repository

Advanced Search

All Outputs (12)

Development of the 'Water-specific P3 risk model': risks identified. (2015)
Conference Proceeding
KORAYEM, M.I., OGUNLANA, O.S. and BOATENG, P. 2015. Development of the 'Water-specific P3 risk model': risks identified. Proceedings of CIB2015: 'going north for sustainability': leveraging knowledge and innovation for sustainable and development, 23-25 November 2015, London, UK. London: IBEA Publications [online], pages 92-103. Available from: http://www.irbnet.de/daten/iconda/CIB_DC28858.pdf

Risk assessment is one of the key success factors of public-private partnerships (PPP) water projects. Factors such as utility condition problems, unsustained increase in water supply requirements, socio-technical issues and changes in government pol... Read More about Development of the 'Water-specific P3 risk model': risks identified..

Use of social media in construction industry: a case study. (2015)
Conference Proceeding
PERERA, S., VICTORIA, M.F. and BRAND, S. 2015. Use of social media in construction industry: a case study. In Egbu, C. (ed.) Proceedings of the 2015 CIB international conference (CIB2015): going north for sustainability: leveraging knowledge and innovation for sustainable construction and development, 23-25 November 2015, London, UK. London: IBEA Publications [online], pages 462-473. Available from: http://www.irbnet.de/daten/iconda/CIB_DC28892.pdf

Social media evolved in the early 2000's with the birth of Facebook and Flickr in 2004. It is hard to ignore the current influence of social media upon modern lifestyle with the continuous development of many social media platforms over the past deca... Read More about Use of social media in construction industry: a case study..

Estimating embodied carbon: a dual currency approach. (2015)
Conference Proceeding
VICTORIA, M.F., PERERA, S., ZHOU, L. and DAVIES, A. 2015. Estimating embodied carbon: a dual currency approach. In Wilkinson, S.P., Xia, J. and Chen, B. (eds.) Proceedings of the 1st International conference on sustainable buildings and structures, 29 October - 1 November 2015, Suzhou, China. Boca Raton: CRC Press [online], pages 223-231. Available from: https://doi.org/10.1201/b19239-40

Embodied carbon (EC) estimating is a growing area of research. EC estimating is evolving since the recent past, thus, undergoing several criticisms. On the other hand, there is a lack of interest among industry practitioners on EC estimating and repo... Read More about Estimating embodied carbon: a dual currency approach..

Analysis of collaborative design and decision making through argumentation applied for pre-BIM stages. (2015)
Conference Proceeding
LEON, M. and TONIOLO, A. 2015. Analysis of collaborative design and decision making through argumentation applied for pre-BIM stages. In Mahjoubi, L., Brebbia, C.A. and Laing, R. (eds.) Building information modelling (BIM) in design, construction and operations: proceedings of the 1st International conference on building information modelling (BIM) in design, construction and operations, 9-11 September 2015, Bristol, UK. WIT transactions on the built environment, 149. Southampton: WIT Press [online], pages 217-228. Available from: https://doi.org/10.2495/BIM150191

The early design stages are the most vital for the development of the design of a building project and the decisions taken during these steps are significant for the further progress of the project, regarding aspects like cost, performance, reliabili... Read More about Analysis of collaborative design and decision making through argumentation applied for pre-BIM stages..

Economic assessment of biomass gasification technology in providing sustainable electricity in Nigerian rural areas. (2015)
Conference Proceeding
GARBA, A. and KISHK, M. 2015. Economic assessment of biomass gasification technology in providing sustainable electricity in Nigerian rural areas. In Proceedings of the 1st International sustainable ecological engineering design for society conference 2015 (SEEDS): healthy, energy efficient buildings and spaces, 17-18 September 2015, Leeds, UK. Leeds: Leeds Beckett University [online], pages 281-292. Available from: https://www.leedsbeckett.ac.uk/as/cebe/seeds/seeds2015_proceedings.pdf

Renewable Energy Technologies (RET) in general, and biomass source in particular, remains one of the means of providing sustainable electricity to rural areas in developing countries. This is because of its strategic value in identifying when and whe... Read More about Economic assessment of biomass gasification technology in providing sustainable electricity in Nigerian rural areas..

Developing an early design stage embodied carbon prediction model: a case study. (2015)
Conference Proceeding
VICTORIA, M., PERERA, S. and DAVIES, A. 2015. Developing an early design stage embodied carbon prediction model: a case study. In Raiden, A. and Aboagye-Nimo, E. (eds.) Proceedings of the 31st Association of Researchers in Construction Management (ARCOM) annual conference, 7-9 September 2015, Lincoln, UK. Manchester: ARCOM [online], pages 267-276. Available from: http://www.arcom.ac.uk/-docs/proceedings/ff96343816e3a48d472a039e584fb584.pdf

The focus of carbon management has shifted from operational carbon towards Embodied Carbon (EC) as a result of zero carbon agenda. Even though effort is made to quantify EC in detail design stage and choose the best solution for design there is no su... Read More about Developing an early design stage embodied carbon prediction model: a case study..

Spotlight on construction cost overrun research: superficial, replicative and stagnated. (2015)
Conference Proceeding
AHIAGA-DAGBUI, D., SMITH, S.D., LOVE, P.E.D. and ACKERMANN, F. 2015. Spotlight on construction cost overrun research: superficial, replicative and stagnated. In Raiden, A. and Aboagye-Nimo, E. (eds.) Proceedings of the 31st Association of Researchers in Construction Management (ARCOM) annual conference, 7-9 September 2015, Lincoln, UK. Reading: ARCOM [online], pages 863-872. Available from: http://www.arcom.ac.uk/-docs/proceedings/4cbaa2ca1021ce2bc010658d11b15190.pdf

Construction projects routinely overrun their cost estimates. A plethora of studies have thus been dedicated to investigating the root causes, sizes, distribution and nature of overruns. The causes range from a poor understanding of the impact of sys... Read More about Spotlight on construction cost overrun research: superficial, replicative and stagnated..

Modelling economic risks in megaproject construction: a systemic approach. (2015)
Conference Proceeding
BOATENG, P., AHIAGA-DAGBUI, D., CHEN, Z. and OGUNLANA, S. 2015. Modelling economic risks in megaproject construction: a systemic approach. In Raiden, A. and Aboagye-Nimo, E. (eds.) Proceedings of the 31st Association of Researchers in Construction Management (ARCOM) annual conference, 7-9 September 2015, Lincoln, UK. Reading: ARCOM [online], pages 115-124. Available from: http://www.arcom.ac.uk/-docs/proceedings/b908d35bed985f2d751737631e538b37.pdf

Megaprojects present significant economic risks to their financiers and sponsors. Factors such as inflation, cash flow issues, material and energy price hikes and change in government policies can cause such capital intensive projects to overrun plan... Read More about Modelling economic risks in megaproject construction: a systemic approach..

Saudi Arabian aviation construction projects: identification of risks and their consequences. (2015)
Conference Proceeding
BAGHDADI, A. and KISHK, M. 2015. Saudi Arabian aviation construction projects: identification of risks and their consequences. In Hajdu, M. and Skibniewski, M. (eds.) Proceedings of the 2015 Creative construction conference (CCC2015), 21-24 June 2015, Krakow, Poland. Budapest: Diamond Congress [online], pages 154-159. Available from: http://2015.creative-construction-conference.com/wp-content/uploads/2015/07/CCC2015_proceedings.pdf

Airport projects are considered to be very complex, as they face a number of challenges which inevitably expose them to risks. In Saudi Arabia, the aviation sector is considered an important sector due to the fact that Saudi Arabia is the first desti... Read More about Saudi Arabian aviation construction projects: identification of risks and their consequences..

Material resources optimization for sustainable construction in Nigeria. (2015)
Conference Proceeding
GARBA, A., OLALEYE, Y.O. and JIBRIN, N.S. 2015. Material resources optimization for sustainable construction in Nigeria. In Proceedings of the 12th International post-graduate research conference 2015, 10-12 June 2015, Salford, UK. Rotterdam: CIB [online], ID 071, pages 824-834. Available from: http://www.irbnet.de/daten/iconda/CIB_DC28781.pdf

The aim of this paper is to examine the ways by which construction material resources can be optimised towards sustainable material resource preservation. Material waste in construction contributes approximately 30-35% of project cost; thus leading t... Read More about Material resources optimization for sustainable construction in Nigeria..

The need for kaizen costing in indigenous Nigerian construction firms. (2015)
Conference Proceeding
OMOTAYO, T. and KULATUNGA, U. 2015. The need for kaizen costing in indigenous Nigerian construction firms. In Ahmed, V., Kulatunga, U., Underwood, J., Aziz, Z. and Pathirage, C. (eds.) Proceedings of the 12th International postgraduate research conference, 10-12 June 2015, Salford, UK. Salford: University of Salford [online], paper number ID 045, pages 587-596. Available from: http://www.irbnet.de/daten/iconda/CIB_DC28781.pdf

The application of adequate cost management methods and techniques before and during construction activities is a major determinant of project success. Construction cost management methods such as target costing, life cycle costing, activity based co... Read More about The need for kaizen costing in indigenous Nigerian construction firms..

Challenges associated with communication medium among project teams on mass housing project delivery in Ghana. (2015)
Conference Proceeding
ADINYIRA, E., KWOFIE, T.E. and AHIAGA-DAGBUI, D.D. 2015. Challenges associated with communication medium among project teams on mass housing project delivery in Ghana. In Badu, E., Ayarkwa, J., Ahadzie, D., Adinyira, E., Owusu-Manu, D. and Kwofie, T. (eds.) Proceedings of the 4th International conference on infrastructure development in Africa (ICIDA 2015), 25-26 March 2015, Kumasi, Ghana. Kumasi: Kwame Nkrumah University of Science and Technology, pages 394-411.

The construction of mass housing has become a very important policy in the government of Ghanas efforts at reducing the countrys housing deficit. Unlike traditional one-off building projects, Mass Housing Projects (MHPs) typically present a plethora... Read More about Challenges associated with communication medium among project teams on mass housing project delivery in Ghana..