Skip to main content

Research Repository

Advanced Search

All Outputs (2)

A continuous improvement framework using IDEF0 for post-contract cost control. (2017)
Journal Article
OMOTAYO, T. and KULATUNGA, U. 2017. A continuous improvement framework using IDEF0 for post-contract cost control. Journal of construction project management and innovation [online], 7(1), pages 1807-1823. Available from: https://doi.org/10520/EJC-8506b6f28

Advancements in construction project management have necessitated a comprehensive rethink of construction project processes. Gantt charts and critical path analysis have been produced to create a work breakdown structure which can identify challenges... Read More about A continuous improvement framework using IDEF0 for post-contract cost control..

A Gemba Kaizen model based on BPMN for small-and medium-scale construction businesses in Nigeria. (2017)
Journal Article
OMOTAYO, T. and KULATUNGA, U. 2017. A Gemba Kaizen model based on BPMN for small-and medium-scale construction businesses in Nigeria. Journal of construction project management and innovation [online], 7(1), pages 1760-1778. Available from: https://doi.org/10520/EJC-8503ec7a8

This article presents a demonstration of how gemba kaizen, which is continuous improvement in the workplace, can be implemented using business process modelling and notation (BPMN). The scope of the study is construction businesses in Nigeria. In dev... Read More about A Gemba Kaizen model based on BPMN for small-and medium-scale construction businesses in Nigeria..