Skip to main content

Research Repository

Advanced Search

All Outputs (3)

Optimisation of wind turbine inspection intervals. (2008)
Journal Article
ANDRAWUS, J.A., WATSON, J., KISHK, M. and GORDON, H. 2008. Optimisation of wind turbine inspection intervals. Wind engineering [online], 32(5), pages 477-490. Available from: https://doi.org/10.1260/030952408786411921

The choice of correct inspection intervals poses a serious challenge to industries that utilise physical assets. Too short an interval increases operational cost and waste production time while too long an interval increases the likelihood of unexpec... Read More about Optimisation of wind turbine inspection intervals..

The impact of effective risk management on project success. (2008)
Conference Proceeding
KISHK, M. and UKAGA, C. 2008. The impact of effective risk management on project success. In Dainty, A. (ed.) Proceedings of the 24th Association of Researchers in Construction Management (ARCOM) annual conference, 1-3 September 2008, Cardiff, UK. Reading: ARCOM [online], volume 2, pages 799-808. Available from: http://www.arcom.ac.uk/-docs/proceedings/ar2008-799-808_Kishk_and_Ukaga.pdf

Project success is the satisfaction of stakeholder needs and is measured by the so-called success criteria as identified at the start of the project. The conventional view of project success based on cost, time and quality is no longer sufficient. Th... Read More about The impact of effective risk management on project success..