Skip to main content

Research Repository

Advanced Search

All Outputs (2)

Key criteria of sustainable hospital refurbishment: a stakeholder review. (2012)
Conference Proceeding
WILSON, G. and KISHK, M. 2012. Key criteria of sustainable hospital refurbishment: a stakeholder review. In Smith, S.D. (ed.) Proceedings of the 28th Association of Researchers in Construction Management (ARCOM) annual conference, 3-5 September 2012, Edinburgh, UK. Reading: ARCOM [online], pages 1423-1433. Available from: http://www.arcom.ac.uk/-docs/proceedings/ar2012-1423-1433_Wilson_Kishk.pdf

Hospital refurbishment has taken a secondary role in the last decade, in favour of new build facilities. This has allowed the Client and the Design Team to build and specify with greater flexibility and from essentially a 'blank canvas'. Correspondin... Read More about Key criteria of sustainable hospital refurbishment: a stakeholder review..

Whole life costing optimisation with integrated logistics support considerations. (2012)
Thesis
BOUACHERA, T. 2012. Whole life costing optimisation with integrated logistics support considerations. Robert Gordon University, PhD thesis.

It has long been recognised that, in the military sector, the Integrated Logistics Support ILS can significantly enhance system effectiveness and add value to their competitiveness. Hence, it is not surprising that many organisations outside to the m... Read More about Whole life costing optimisation with integrated logistics support considerations..