Skip to main content

Research Repository

Advanced Search

All Outputs (6)

Building time, cost and quality performance of modern methods of construction in a live research project. (2023)
Conference Proceeding
ATANASOV, V., GREENWOOD, D.J., MADEBWE, T.M. and COX, R. 2023. Building time, cost and quality performance of modern methods of construction in a live research project. In Tutesigensi, A. and Neilson, C.J. (eds.) Proceedings of the 39th Association of Researchers in Construction Management annual conference (ARCOM 2023), 4-6 September 2023, Leeds, UK. London: ARCOM [online], pages 457-466. Available from: https://www.arcom.ac.uk/-docs/archive/2023-Indexed-Papers.pdf

The use of modern methods of construction (MMC) has been embraced by the construction sector of many countries, largely due to assertions that some MMC processes can be economically effective and efficient. MMC have been received as opportunities by... Read More about Building time, cost and quality performance of modern methods of construction in a live research project..

Corrigendum to: Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for differences in opinion. (2022)
Journal Article
ATANASOV, V.A., GREENWOOD, D.J., SANCHEZ, D.E. and HATCHER, C.J. 2022. Corrigendum to: Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion. IOP conference series: earth and environmental science [online], 1101(5): planning, partnership, and law; selected papers from 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations, 27-30 June 2022, Melbourne, Australia, article 052033. Available from: https://doi.org/10.1088/1755-1315/1101/5/052033

This is a correction for the article published at https://doi.org/10.1088/1755-1315/1101/5/052001.

Corrigendum to: Forensic delay analysis as evidence of transaction costs in construction projects. (2022)
Journal Article
ATANASOV, V.A., GREENWOOD, D.J., ROSS, H. and SANCHEZ, D.E. 2022. Corrigendum: forensic delay analysis as evidence of transaction costs in construction projects. IOP conference series: earth and environmental science [online], 1101(5): planning, partnership, and law; selected papers from 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations, 27-30 June 2022, Melbourne, Australia. article 052034. Available from: https://doi.org/10.1088/1755-1315/1101/5/052034

This corrigendum contains several corrections to the text originally published at https://doi.org/10.1088/1755-1315/1101/5/052009.

Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion. (2022)
Journal Article
ATANASOV, V.A., GREENWOOD, D.J., SANCHEZ, D.E. and HATCHER, C.J. 2022. Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion. IOP conference series: earth and environmental science [online], 1101(5): planning, partnership, and law; selected papers from 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations, 27-30 June 2022, Melbourne, Australia, article 052001. Available from: https://doi.org/10.1088/1755-1315/1101/5/052001

Construction delay claims are a leading cause for disputes in the sector. There are two primary aspects to such disagreements: legal and factual. The focus of this paper is the latter. It identifies, evaluates and ranks the factors that impact the an... Read More about Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion..

Forensic delay analysis as evidence of transaction costs in construction projects. (2022)
Journal Article
ATANASOV, V.A., GREENWOOD, D.J., ROSS, H. and SANCHEZ, D.E. 2022. Forensic delay analysis as evidence of transaction costs in construction projects. IOP conference series: earth and environmental science [online], 1101(5): planning, partnership, and law; selected papers from 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations, 27-30 June 2022, Melbourne, Australia, article 052009. Available from: https://doi.org/10.1088/1755-1315/1101/5/052009

Construction projects are characterised by supply chains with multiple contracts and significant transaction costs. An example of these costs is to be found in the management of project delays. The operationalisation and measurement of transaction co... Read More about Forensic delay analysis as evidence of transaction costs in construction projects..

Forensic delay analysis: an investigation of the reasons for disagreements in time-related disputes. (2021)
Conference Proceeding
ATANASOV, V., GREENWOOD, D., THURAIRAJAH, N. and HATCHER, C. 2021. Forensic delay analysis: an investigation of the reasons for disagreements in time-related disputes. In Scott, L., Neilson, C.J. (eds.) Proceedings of 37th ARCOM (Association of Researchers in Construction Management) annual conference 2021: recover, rebuild and renew: shifting mindsets and practices to change the future, 6-7 September 2021, [virtual conference]. Leeds: ARCOM [online], pages 460-469. Available from: http://www.arcom.ac.uk/-docs/proceedings/c53e4fee934df27582826028fc94751f.pdf

Construction project delays are widespread and persistent. Disputes frequently occur, and their complexity and value has produced a role for experts specialising in Forensic Delay Analysis (FDA). Previous literature suggests that the main problem (an... Read More about Forensic delay analysis: an investigation of the reasons for disagreements in time-related disputes..