Re-thinking post-contract cost controlling techniques in the Nigerian construction industry.

Omotayo, Temitope; Kulatunga, Udayangani

Authors

Temitope Omotayo

Udayangani Kulatunga



Contributors

Y.G. Sandanayake
Editor

G.I. Karunasena
Editor

T. Ramachandra
Editor

Abstract

The challenges of cost and time overruns, construction disputes and client dissatisfaction have plagued the construction industry in Nigeria. This may be as a result of the approaches used in monitoring construction costs. The execution phase of a construction project relies on post-contract cost controlling techniques, such as cash flow monitoring, interim valuations, final account preparation, monitoring activities, site meetings and documentation of activities on site. These techniques are imperative for project success. The purpose of this paper is to assess the various techniques used in post-contract cost control in Nigeria, in terms of their effectiveness. The data was gathered from one hundred and thirty five (135) cost and project managers in Nigeria. The Kendall's coefficient of concordance was used to test the post - contract cost controlling techniques identified, through an extensive literature review along with one sample run test. The findings reveal that monitoring material cost was the most effective and important technique with a Kendall's W score of 1.33 and 11.44 respectively. Cash flow monitoring had the lowest score of 7.85 for effectiveness, while variation management had the lowest score of 6.88 for importance. The effectiveness of the techniques was further evaluated using one sample run test. The findings show that sixteen out of the eighteen techniques were not effective from an overall point of view. The cost controlling techniques used in the Nigerian construction industry are deficient and generally ineffective. Therefore, there is a need to research alternative post-contract cost controlling techniques for the construction industry in Nigeria.

Citation

OMOTAYO, T. and KULATUNGA, U. 2016. Re-thinking post-contract cost controlling techniques in the Nigerian construction industry. In Sandanayake, Y.G., Karunasena, G.I. and Ramachandra, T. (eds.) Proceedings of the 5th World construction symposium 2016: greening environment, eco-innovations and entrepreneurship, 29-31 July 2016, Colombo, Sri Lanka. Colombo: University of Moratuwa [online], pages 380-388. Available from: http://www.becon.mrt.ac.lk/images/CIOB-2016/proceedings.pdf

Conference Name 5th World construction symposium 2016
Conference Location Colombo, Sri Lanka
Start Date Jul 29, 2016
End Date Jul 31, 2016
Acceptance Date Jan 30, 2016
Online Publication Date Jul 29, 2016
Publication Date Jul 31, 2016
Deposit Date Jul 7, 2016
Publicly Available Date Jul 7, 2016
Print ISSN 2362-0919
Publisher University of Moratuwa
Pages 380-388
Series ISSN 2362-0919
Keywords Construction industry; Cost; Cost controlling techniques; Nigeria; Post contract
Public URL http://hdl.handle.net/10059/2631
Publisher URL http://www.becon.mrt.ac.lk/images/CIOB-2016/proceedings.pdf