Skip to main content

Research Repository

Advanced Search

Effective feedback of whole-life data to the design process.

Kishk, Mohammed; Al-Hajj, A.; Pollock, R.; Aouad, G.

Authors

Mohammed Kishk

A. Al-Hajj

R. Pollock

G. Aouad



Abstract

Key activities of the implementation of whole-life costing (WLC) as a management tool during the occupancy stage are outlined. Then, the logic of a novel whole-life management approach is designed around two recently developed generic WLC databases. The proposed approach allows the systematic data collection of the running costs of occupied buildings and provides the necessary link between occupied buildings and the design process. Besides, it employs a generic cost-significant relation that automatically identifies the cost-significance of the building components on the elements, activities and cost items levels over the analysis period.

Citation

KISHK, M., AL-HAJJ, A., POLLOCK, R. and AOUAD, G. 2003. Effective feedback of whole-life data to the design process. Journal of financial management of property and construction, 8(2), pages 89-98.

Journal Article Type Article
Acceptance Date Dec 31, 2003
Online Publication Date Dec 31, 2003
Publication Date Dec 31, 2003
Deposit Date Apr 1, 2008
Publicly Available Date Apr 1, 2008
Journal Journal of Financial Management of Property and Construction
Print ISSN 1366-4387
Electronic ISSN 1759-8443
Publisher Emerald
Peer Reviewed Peer Reviewed
Volume 8
Issue 2
Pages 89-98
Keywords Cost significance; Whole life costing; Whole life management
Public URL http://hdl.handle.net/10059/151

Files




You might also like



Downloadable Citations