Omayma Motaleb
An investigation into the risk of construction project delays in the UAE.
Motaleb, Omayma; Kishk, Mohammed
Authors
Mohammed Kishk
Abstract
The growing rate of delays in project delivery is considered a major criticism of the construction companies in the United Arab Emirates (UAE). This paper aims to investigate the causes and effects behind the delays pertaining to delivery of construction projects in the UAE. The study is exploratory in nature, and incorporates a pilot questionnaire survey and interviews. An extensive literature review indicates potential factors that have possible effects on construction completion delay. The questionnaire forms were sent to 50 construction companies. Thirty-five (70%) completed responses were received. Analysis of the survey data has revealed that about 42 potential causes and effects of delay relate to various groups of stakeholders. The results show the top fifteen factors relate to clients, project managers and finance aspects. It was found that cost and time overruns are the most significant effects. These results are in partial agreement with previous studies. The paper argues that the key determinant in ensuring project control is on-time project delivery. The results of the study can provide moderate support for a suggested hypothesis, through a framework of project success factors. It should be of high concern to knowledge managers in various roles and decision-makers.
Citation
MOTALEB, O. and KISHK, M. 2013. An investigation into the risk of construction project delays in the UAE. International journal of information technology project management [online], 4(3), pages 50-65. Available from: https://doi.org/10.4018/jitpm.2013070104
Journal Article Type | Article |
---|---|
Acceptance Date | Jul 31, 2013 |
Online Publication Date | Jul 31, 2013 |
Publication Date | Sep 30, 2013 |
Deposit Date | Aug 28, 2014 |
Publicly Available Date | Aug 28, 2014 |
Journal | International journal of information technology project management |
Print ISSN | 1938-0232 |
Electronic ISSN | 1938-0240 |
Publisher | IGI Global |
Peer Reviewed | Peer Reviewed |
Volume | 4 |
Issue | 3 |
Pages | 50-65 |
DOI | https://doi.org/10.4018/jitpm.2013070104 |
Keywords | Client; Construction project success factors; Delay risk; Knowledge management; United Arab Emirates (UAE) |
Public URL | http://hdl.handle.net/10059/1042 |
Contract Date | Aug 28, 2014 |
Files
MOTALEB 2013 An investigation into the risk
(1.1 Mb)
PDF
Publisher Licence URL
https://creativecommons.org/licenses/by-nc-nd/4.0/
Downloadable Citations
About OpenAIR@RGU
Administrator e-mail: publications@rgu.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search