Skip to main content

Research Repository

Advanced Search

A supervisory system for partial discharge monitoring.

Saeed, B.I.; Upton, D.W.; Vieira, M.F.Q.; Torres, F.; Mohamed, H.; Mistry, K.; Mather, P.J.; Lazaridis, P.; Khan, U.; Tachtatzis, C.; Atkinson, R.; Judd, M.; Glover, I.A.

Authors

B.I. Saeed

D.W. Upton

M.F.Q. Vieira

F. Torres

H. Mohamed

K. Mistry

P.J. Mather

P. Lazaridis

U. Khan

C. Tachtatzis

R. Atkinson

M. Judd

I.A. Glover



Abstract

Continuous measurement of partial discharge plays a vital role in monitoring the status of high voltage equipment in electricity substations. This requires a comprehensive supervisory system to detect, monitor, collect and locate partial discharge activities. Most of the sensors developed so far require a dedicated software and hardware platform to integrate them into a system. A comprehensive supervisory system is proposed and designed that integrates broadband radiometric sensors into a robust wireless network. The network is easy to install and reconfigure. Partial discharge activities are collected by the sensors and transferred to a central database where processed to provide monitoring, visualisation and localisation of the partial discharge sources.

Citation

SAEED, B.I., UPTON, D.W., VIEIRA, M.F.Q., TORRES, F., MOHAMED, H., MISTRY, K., MATHER, P.J., LAZARIDIS, P., KHAN, U., TACHTATZIS, C., ATKINSON, R., JUDD, M. and GLOVER, I.A. 2018. A supervisory system for partial discharge monitoring. In Proceedings of the 2nd Union radio-scientifique internationale (URSI) Atlantic radio science conference (AT-RASC) (URSI AT-RASC 2018)[online], 28 May - 1 June 2018, Gran Canaria, Spain. Gran Canaria: URSI [online}, paper ID CO2-01. Available from: http://www.ursi.org/proceedings/procAT18/papers/KPDWSNProjectProjectPapersandPresentationsPendingPublicationPID5208027.pdf

Presentation Conference Type Conference Paper (unpublished)
Conference Name 2nd Union radio-scientifique internationale (URSI) Atlantic radio science conference (AT-RASC) (URSI AT-RASC 2018)
Conference Location Gran Canaria, Spain
Start Date May 28, 2018
End Date Jun 1, 2018
Deposit Date Oct 8, 2020
Publicly Available Date Oct 8, 2020
Keywords Monitoring; High voltage equipment; Electricity substations; Partial discharge activities; Radiocommunications systems
Public URL https://rgu-repository.worktribe.com/output/973192
Publisher URL http://www.ursi.org/proceedings/procAT18/programme.html

Files




You might also like



Downloadable Citations