4D BIM integrated construction supply chain logistics to optimise on-site production.
(2020)
Journal Article
MAGILL, L.J., JAFARIFAR, N., WATSON, A. and OMOTAYO, T. 2022. 4D BIM integrated construction supply chain logistics to optimise on-site production. International journal of construction management [online], 22(12), pages 2325-2334. Available from: https://doi.org/10.1080/15623599.2020.1786623
Loss of productivity through on-site delays and disruptions is a significant problem in the construction industry. This can be caused by workforce, materials, and equipment clashes. A major need for the industry is to improve construction logistic ef... Read More about 4D BIM integrated construction supply chain logistics to optimise on-site production..