Dr Vasil Atanasov v.atanasov@rgu.ac.uk
Lecturer
This is a correction for the article published at https://doi.org/10.1088/1755-1315/1101/5/052001.
ATANASOV, V.A., GREENWOOD, D.J., SANCHEZ, D.E. and HATCHER, C.J. 2022. Corrigendum to: Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion. IOP conference series: earth and environmental science [online], 1101(5): planning, partnership, and law; selected papers from 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations, 27-30 June 2022, Melbourne, Australia, article 052033. Available from: https://doi.org/10.1088/1755-1315/1101/5/052033
| Journal Article Type | Article |
|---|---|
| Conference Name | 2022 World building congress (WBC2022): building our future; informing practice to enhance the lives of current and future generations |
| Acceptance Date | Nov 1, 2022 |
| Online Publication Date | Dec 31, 2022 |
| Publication Date | Dec 31, 2022 |
| Deposit Date | Jan 29, 2024 |
| Publicly Available Date | Jan 29, 2024 |
| Journal | IOP Conference Series: Earth and Environmental Science |
| Print ISSN | 1755-1307 |
| Electronic ISSN | 1755-1315 |
| Publisher | IOP Publishing |
| Peer Reviewed | Peer Reviewed |
| Volume | 1101 |
| Issue | 5 |
| Article Number | 052033 |
| Item Discussed | ATANASOV, V.A., GREENWOOD, D.J., SANCHEZ, D.E. and HATCHER, C.J. 2022. Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion. IOP conference series: earth and environme |
| DOI | https://doi.org/10.1088/1755-1315/1101/5/052033 |
| Keywords | Construction delay claims; Disputes; Case studies; Disagreements |
| Public URL | https://rgu-repository.worktribe.com/output/2188280 |
| Related Public URLs | https://rgu-repository.worktribe.com/output/1699597 (Original conference paper) |
ATANASOV 2022 Corrigendum to: Factual disagreements (VOR)
(818 Kb)
PDF
Publisher Licence URL
https://creativecommons.org/licenses/by/3.0/
Forensic delay analysis: an investigation of the reasons for disagreements in time-related disputes.
(2021)
Presentation / Conference Contribution
Forensic delay analysis as evidence of transaction costs in construction projects.
(2022)
Presentation / Conference Contribution
Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion.
(2022)
Presentation / Conference Contribution
Building time, cost and quality performance of modern methods of construction in a live research project.
(2023)
Presentation / Conference Contribution
About OpenAIR@RGU
Administrator e-mail: publications@rgu.ac.uk
This application uses the following open-source libraries:
Apache License Version 2.0 (http://www.apache.org/licenses/)
Apache License Version 2.0 (http://www.apache.org/licenses/)
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search