Harry Hussey
Improving the methods of description of building works in the UK.
Hussey, Harry; Atanasov, Vasil
Authors
Dr Vasil Atanasov v.atanasov@rgu.ac.uk
Lecturer
Contributors
Craig Thomson
Editor
Christopher J. Neilson
Editor
Abstract
Since 1922, methods and rules of measurement have been developed to address the continual need to describe and quantify building work in the UK and revised to adapt to changes in industry practices and materials, yet not all changes have been addressed adequately. Currently, surveyors often work directly for clients and, as a result, have lost the knowledge relating to some aspects of construction cost which was historically provided by builders and merely describe the material content of elemental building designs produced by architects. Therefore, a knowledge gap exists in the belief that the current methods are efficient and effective (i.e. produce full descriptions of building work). This paper identifies key issues with these methods and develops the main criteria for a superior solution. The research method includes the analysis, synthesis and evaluation of thirteen documents, which represent the evolution of the rules of measurement in the UK, and academic literature. An improved system based on describing 'workpieces' of work on-site, including the key criteria required to produce an enhanced standard method of description of building work is offered.
Citation
HUSSEY, H. and ATANASOV, V. 2024. Improving the methods of description of building works in the UK. In Thomson, C. and Neilson, C.J. (eds.) Proceedings of the 40th Association of Researchers in Construction Management annual conference 2024 (ARCOM 2024): looking back to move forward, 2-4 September 2024, London, UK. London: ARCOM [online], pages 509-518. Available from: https://www.arcom.ac.uk/-docs/archive/2024-Indexed-Papers.pdf
Presentation Conference Type | Conference Paper (published) |
---|---|
Conference Name | 40th Association of Researchers in Construction Management annual conference 2024 (ARCOM 2024): looking back to move forward |
Start Date | Sep 4, 2024 |
End Date | Sep 4, 2024 |
Acceptance Date | May 20, 2024 |
Online Publication Date | Sep 2, 2024 |
Publication Date | Dec 31, 2024 |
Deposit Date | Nov 15, 2024 |
Publicly Available Date | Nov 15, 2024 |
Publisher | ARCOM Association of Researchers in Construction Management |
Peer Reviewed | Peer Reviewed |
ISBN | 9780995546387 |
Keywords | Building work; Communication; Cost; Description; Measurement |
Public URL | https://rgu-repository.worktribe.com/output/2578324 |
Publisher URL | https://www.arcom.ac.uk/conf-archive-indexed.php |
Files
HUSSEY 2024 Improving the methods (VOR)
(709 Kb)
PDF
Publisher Licence URL
https://creativecommons.org/licenses/by-nc-nd/4.0/
Copyright Statement
© ARCOM. All rights reserved.
You might also like
Factual disagreements in construction delay disputes: identification, evaluation and testing of the justifications for difference in opinion.
(-0001)
Presentation / Conference Contribution
Forensic delay analysis as evidence of transaction costs in construction projects.
(-0001)
Presentation / Conference Contribution
Forensic delay analysis: an investigation of the reasons for disagreements in time-related disputes.
(-0001)
Presentation / Conference Contribution
Downloadable Citations
About OpenAIR@RGU
Administrator e-mail: publications@rgu.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search