Skip to main content

Research Repository

Advanced Search

Design and development of a novel automated recovery system for the decommissioning of concrete mats from the sea bed to de-risk diving operations

People Involved

Project Description

Design a novel remote recovery system for the decommissioning of concrete mats from the seabed with the use of baskets to recover to the back deck of an offshore support vessel.

The system will eliminate the need for divers, improving Health & Safety outcomes and standardising operational costs.

Status Project Live
Funder(s) Innovate UK
Harper UK
Value £269,834.00
Project Dates Aug 3, 2021 - Aug 2, 2024

You might also like

Granular Subsurface Seal Jun 1, 2017 - Mar 15, 2018
This project is aimed at developing and conducting physical tests on a new set of unique swellable materials that can expand into, seal and plug undesirable cavities and isolate distressed porous media downhole of an oil well.

During d... Read More about Granular Subsurface Seal.

Stab-In Pipe Stage 2 Feb 1, 2019 - Feb 14, 2020
This is Stage 2 of a project to design and develop new non-threaded drill pipe joints. .

Stage 2 will be related to 3D printing of conceptual design of snap latch based non-threaded tool joints, electromagnetic calculations and further... Read More about Stab-In Pipe Stage 2.